Wednesday, November 23, 2011

Solidifying

The finished Children's Area expansion

The Meeting Room and Young Adult expansions
Young Adult expansion and Classrooms
Sidewalk and entrance stairs



Wednesday, October 26, 2011

Birdseye Views!

The Entrance

The Children's Area

The Meeting Room


Tuesday, October 11, 2011

The latest changes

Bricks are being laid all over the building


The classroom expansion in the back is taking shape.

Monday, September 19, 2011

Creating the roof


The men from Georgia Metals were out this morning running a metal fabricator press, producing the lengths of roofing needed to cover the additions.


A giant roll of metal is unspooled and fed into the fabricator.


There is a sharp blade at this end that cuts the sheets after the correct amount has been run through and formed into shape.



Inside the fabricator the sheet metal is formed, and then is directed out and onto a series of supports.


The finished lengths are stacked together and will end up on our new roof soon.

Friday, September 9, 2011

Starting the Classroom expansion


They have prepared the pad and footings and will be delivering the cement Monday, September 12.

Taking Shape

The meeting room expansion is taking a more solid shape this week

This is the view on the rather gloomy September 4
The changes by the much-cheerier September 9

Monday, August 29, 2011

Work on the side patrons rarely see

Here's what the rear of the library looked like before construction.
This tree made it through severe damage during the tornado of 2006 and now construction.

Prepping the soil for expansion.
Removal of the bricks
Temporary wall at employee entrance
This will all be part of the new circulation area.





Trusses


Angles


Lifting the trusses into place with a crane


Setting trusses in place




Wednesday, August 17, 2011

The incredible shrinking library

They will be taking down the wall on the left hand side of the photograph. It is a load bearing wall and so the temporary wall had to be built quite far into the library to support the weight of the roof. The new circulation area and workroom will be built in this general area.



On August 25 they added a door.


Happy surprises from all the disturbance

Wildflowers!

Vinca (not normally a wildflower, this one seems to have escaped from a garden)
Portulaca Pilosa
Cassia Obtusifolia, Coffee-weed
Jacquemontia Tamnifolia

Walls are going up

With the plywood walls up, you can get a better idea of what the new space will be like.
This will be the expanded children's area

This is the expanded entrance

Thursday, August 4, 2011

Some timeline photos of the front


Concrete and Foundations Appear

Although a lot of work has been done since the last blog post, much of it has been of the quiet concrete nature.

They dug the footings and built the foundation for the entrance expansion.


And for the children's area expansion.


Then they filled the foundation to create the pad for the children's expansion.


They also filled the foundation for the entrance expansion.

Then they dug the footings for the rear expansion.


They also dug the footings for the northwest expansion.


They laid the foundation for the rear west expansion.


Here is another view of the northwest expansion.

Wednesday, June 22, 2011

The latest expansion work


Footings for the new meeting room and plumbing for the new restrooms


Footings for the new children's area


Starting work on the footings for the storage and kitchen area of the new meeting room


Cutting out the soil for the parking lot expansion